Future Plan for the Water Transfer from the Underground Reservoirs
by user
Comments
Transcript
Future Plan for the Water Transfer from the Underground Reservoirs
Future Plan for the Water Transfer from the Underground Reservoirs Priority measures (1) (- Golden Week in May) Present status Leakage was found Leakage was found A small amount of leakage was suspected No.1 (13,000m3) Priority measures (2) (Late May -) Approx. Transfer started since April 23 1,600m3 6,200m3 No.2 (14,000m3) Approx. 900m3 No.3 (11,000m3) Approx. 8,400m3 No.4 (4,000m3) No.5 (2,000m3) Approx. 3,000m3 No.6 (10,000m3) Approx. 7,500m3 No.7 (4,000m3) <Reference> April 25, 2013 Tokyo Electric Power Company Transfer had been in progress Tra ns from April 16 to April 22 fer s in ce Ap ril 25 4,6 00 m3 H2 tank Approx. 1,070m3 *1 Filtrate water tank 0m3 G6 tank (19,000m3) 15,900m3 0m3 *1 The transferred amount was confirmed by the water gauge installed at the H2 area tank. *2 The water transfer is planned to be performed during daytime. Progress of transfer 本日の移送実績 移送ルート Transfer route Started 開始日時 Ended 停止日時 No.2 → H2 H2エリアタンク area tank *2 ※2 No.1 → 4/25 9:36 ~ 4/25 14:27 No.1 No.1 → Filtrate water tank → ろ過水タンク 4/25 10:58 (Transfer is in progress) (移送実施中) ~