Future Plan for the Water Transfer from the Underground Reservoirs

by user

on
Category: Documents
77

views

Report

Comments

Transcript

Future Plan for the Water Transfer from the Underground Reservoirs
Future Plan for the Water Transfer from the Underground Reservoirs
Priority measures (1)
(- Golden Week in May)
Present status
Leakage
was found
Leakage
was found
A small
amount of
leakage was
suspected
No.1
(13,000m3)
Priority measures (2)
(Late May -)
Approx. Transfer started since April 23 1,600m3
6,200m3
No.2
(14,000m3)
Approx.
900m3
No.3
(11,000m3)
Approx.
8,400m3
No.4
(4,000m3)
No.5
(2,000m3)
Approx.
3,000m3
No.6
(10,000m3)
Approx.
7,500m3
No.7
(4,000m3)
<Reference>
April 25, 2013
Tokyo Electric Power Company
Transfer had been in progress
Tra
ns
from April 16 to April 22
fer
s in
ce
Ap
ril
25
4,6
00
m3
H2 tank
Approx.
1,070m3 *1
Filtrate water tank
0m3
G6
tank
(19,000m3)
15,900m3
0m3
*1 The transferred amount was confirmed by
the water gauge installed at the H2 area tank.
*2 The water transfer is planned to be
performed during daytime.
Progress
of transfer
本日の移送実績
移送ルート
Transfer
route
Started
開始日時
Ended
停止日時
No.2
→ H2
H2エリアタンク
area tank *2 ※2
No.1
→ 4/25
9:36
~
4/25
14:27
No.1
No.1
→ Filtrate water tank
→ ろ過水タンク
4/25
10:58
(Transfer
is in progress)
(移送実施中)
~