Future Plan for the Water Transfer from the Underground Reservoirs
Future Plan for the Water Transfer from the Underground Reservoirs
Priority measures (1)
(- Golden Week in May)
Present status
Leakage
was found
Leakage
was found
A small
amount of
leakage was
suspected
No.1
(13,000m3)
No.2
(14,000m3)
No.3
(11,000m3)
Priority measures (2)
(Late May -)
1,600m3
Approx.Transferred from April 23 to April 26*1
6,200m3
Tra
Transfer had been in progress
H2 tank
nsf
er
from
April
16
to
April
22
is i
Approx.
Approx.
np
r
ogr
1,070m3 *2
900m3
ess
sin
ce
Ap
ril 2
Approx.
4,6 5
Filtrate water tank
8,400m3
00
m3
No.4
(4,000m3)
No.5
(2,000m3)
Approx.
3,000m3
No.6
(10,000m3)
Approx.
7,500m3
No.7
(4,000m3)
<Reference>
April 26, 2013
Tokyo Electric Power Company
0m3
15,900m3
G6
tank
(19,000m3)
0m3
*1 Transfer will be started after transfer to the
filtrate tank is completed.
*2 The transferred amount was confirmed by
the water gauge installed at the H2 area tank.
*3 The water transfer is planned to be
performed during daytime.
Progress
of transfer
本日の移送実績
移送ルート
Transfer
route
Ended
停止日時
Started
開始日時
→ H2
H2エリアタンク
area tank *3 ※3
No.1No.2
→ 4/26
9:34
~
4/26
12:04
No.1
No.1
→ Filtrate water tank
→ ろ過水タンク
4/25
10:58
(Transfer
is in progress)
(移送実施中)
~