Future Plan for the Water Transfer from the Underground Reservoirs
by user
Comments
Transcript
Future Plan for the Water Transfer from the Underground Reservoirs
Future Plan for the Water Transfer from the Underground Reservoirs Priority measures (1) (- Golden Week in May) Present status Leakage was found Leakage was found A small amount of leakage was suspected No.1 (13,000m3) No.2 (14,000m3) No.3 (11,000m3) Priority measures (2) (Late May -) 1,600m3 Approx.Transferred from April 23 to April 26*1 6,200m3 Tra Transfer had been in progress H2 tank nsf er from April 16 to April 22 is i Approx. Approx. np r ogr 1,070m3 *2 900m3 ess sin ce Ap ril 2 Approx. 4,6 5 Filtrate water tank 8,400m3 00 m3 No.4 (4,000m3) No.5 (2,000m3) Approx. 3,000m3 No.6 (10,000m3) Approx. 7,500m3 No.7 (4,000m3) <Reference> April 26, 2013 Tokyo Electric Power Company 0m3 15,900m3 G6 tank (19,000m3) 0m3 *1 Transfer will be started after transfer to the filtrate tank is completed. *2 The transferred amount was confirmed by the water gauge installed at the H2 area tank. *3 The water transfer is planned to be performed during daytime. Progress of transfer 本日の移送実績 移送ルート Transfer route Ended 停止日時 Started 開始日時 → H2 H2エリアタンク area tank *3 ※3 No.1No.2 → 4/26 9:34 ~ 4/26 12:04 No.1 No.1 → Filtrate water tank → ろ過水タンク 4/25 10:58 (Transfer is in progress) (移送実施中) ~