Comments
Description
Transcript
Revising drawings
5.6 Revising drawings When you revise drawings, you can attach information to them about the changes you have made. Tekla Structures displays this information alongside the revision number or mark. The revision date also appears in the revision table within drawings. The revision number or mark is also shown in the Drawing List by default. Revision information can also be used in reports. You can revise drawings through the Drawing List or when the drawing is open. When you revise the drawings using Add Revision Mark in an open drawing, Tekla Structures creates marks in the drawing indicating the places where the changes have been made. The report drawing_issue_rev.xsr shows the most recent revision dates of drawings. To show the revision mark instead of the revision number in the Drawing List, set the advanced option XS_SHOW_REVISION_MARK_ON_DRAWING_LIST to TRUE. See also XS_SHOW_REVISION_MARK_ON_DRAWING_LIST Adding revision marks on page 192 Creating revisions on page 277 Changing revisions on page 278 Deleting revisions on page 278 Creating revisions You can create revisions to follow the changes in the drawing. To create a revision: 1. In the Drawing List, select the drawings to revise. 2. Click Revision.... The Revision Handling dialog box is displayed. 3. Enter a mark in the Mark box. Marks can be numerical or alphabetical such as 1, 2, 3… or A, B, C… 4. Fill in the Created by information and select the creation date from the calendar that is displayed when you click the down-arrow next to the Date option. 5. If you need to give information about who checked and approved the drawing, enter the information in the corresponding boxes and select the appropriate dates. 6. Enter a revision description in the Description box. 7. Enter delivery information in the Delivery box. 8. Enter any additional information in the Info 1 and Info 2 boxes. Working with drawings 277 Revising drawings 9. Click Create. The revision number or mark is now displayed in the Drawing List. When you open the drawing, you can see the revision information in the revision table if there is one in the drawing. Each drawing has its own unique revision number, but several drawings can share the same revision mark, date, and other information. To attach the same revision information to several drawings simultaneously, select multiple drawings from the drawing list. See also Revising drawings on page 276 Revision handling attributes on page 279 Changing revisions You can change revision information afterwards. To change a revision: 1. Select a revised drawing from the Drawing List. 2. Click Revision.... 3. In the Revision Handling dialog box, select the number of the revision that you want to change from the Rev. No. list. 4. Change the revision information. 5. Click Modify. 6. Close the Revision Handling dialog box. See also Working with drawings on page 272 Revision handling attributes on page 279 Deleting revisions You can delete unnecessary revisions. To delete a revision: 1. Select a revised drawing from the Drawing List. 2. Click Revision.... 3. In the Revision Handling dialog box, select the revision number from the list next to the Mark box. Working with drawings 278 Revising drawings 4. Click Delete. When you delete a revision, Tekla Structures automatically adjusts the remaining revision numbers for that drawing. The revision marks do not change. See also Working with drawings on page 272 Revision handling attributes The revision handling attributes can be included in drawing templates and report templates. All revision handling attributes and the corresponding options in the Revision Handling dialog box are listed below. Revision handling attribute Option in the Revision Handling dialog box MARK The revision mark in the Mark box. NUMBER The revision number in Rev. No. CREATED_BY The Created by information of the revision. DATE_CREATE Date next to Created by. CHECKED_BY The Checked by information of the revision. DATE_CHECKED Date next to Checked by. APPROVED_BY The Approved by information of the revision. DELIVERY The Delivery information of the revision. DESCRIPTION The revision Description. DATE_APPROVED Date next to Approved by. INFO1 The Info 1 text of the revision. INFO2 The Info 2 text of the revision. LAST The revision number of the latest revision in Rev. No.. LAST_CREATED_BY The Created by information of the latest revision. LAST_CHECKED_BY The Checked by information of the latest revision. LAST_DATE_CHECKED The Checked by Date of the latest revision. LAST_DATE_APPROVED The approval Date of the latest revision. LAST_DELIVERY The Delivery information of the latest revision LAST_MARK The revision mark of the latest revision in the Mark box. LAST_DESCRIPTION The Description of the latest revision. LAST_DATE_CREATE The Created by date of the latest revision LAST_APPROVED_BY The Approved by information of the latest delivery. LAST_INFO1 The Info 1 text of the latest revision. LAST_INFO2 The Info 2 text of the latest revision. See also Creating revisions on page 277 Working with drawings 279 Revising drawings